Pouring concrete for the swimming pool of Kooh Noor Tower

Pouring concrete for the swimming pool of Kooh Noor Tower

Pouring concrete for the swimming pool of Kouh Noor Tower, 25th floor, approximately 120 meters

Pictures of the testing and commissioning of parts of the pool of the Misagh Melal Grand Hotel

Pictures of the testing and commissioning of parts of the pool of the Misagh Melal Grand Hotel

Pictures of the testing and commissioning of parts of the pool of the Misagh Melal

Follow Us on Instagram

For more information and news follow us on instagram

Follow us on instagram: @zisa.group
X